CASE / commissioning.system
Web-Based PLC Testing Architecture
Commissioning system improvement on the critical path.
Context
Machine testing process for large automated systems in delivery-critical environments.
Constraint
Legacy workflow relied on USB exports and laptop back-and-forth with PLC data, adding unnecessary steps.
Architecture
- Direct PLC communication from a web interface
- Centralized UI for test execution and validation
- Structured data availability by design, without manual transfers
Outcome
- ~40% reduction in testing cycle time
- Removed manual bottlenecks and fragile handling
- Improved repeatability and operational clarity
// workflow: legacy.usb.loop -> integrated.web.plc.interface
PLC <-> Web Interface <-> Structured Data -> Test Validation